Best Single-Family Home over 4,500 Sq. Ft.

CHBAVI Vancouver Island Building Industry Awards (VIBI) | CHBA Vancouver Island

Requirements

The total area of the home must be over 4,500 sq. ft.

The square footage of the home includes the main and upper floors, excluding the garage and basement areas. If a finished basement is an integral part of the home and shown in the images then it should be included in the square footage calculation.

May include new forms of housing such as laneway homes, duplexes, triplexes, and fee simple strata. 

Fields
  • Project Name
  • Is this Project on Vancouver Island?
  • Digital images
    - Two (2) showing exterior (please, no night-time images) - Four (4) showing the interior - Four (4) of your choice
  • Digital Floorplans
  • Upload Homeowner Permission Form
  • Project Description: Construction details/techniques to achieve best practices

    • Bullet form is recommended.
    • The text should show how you specifically meet the criteria
  • Marketing Description
  • Project Description: Exterior: architectural character, curb appeal and integration of the home into its setting

    • Bullet form is recommended.
    • The text should show how you specifically meet the criteria.
  • Project Description: Interior: creative and innovative use of space, architectural and finishing detail

    • Bullet form is recommended.
    • The text should show how you specifically meet the criteria
  • Project Description: Functionality of floor plan

    • Bullet form is recommended.
    • The text should show how you specifically meet the criteria.
  • Project Description: Environmental/energy efficiency inclusions

    • Bullet form is recommended.
    • The text should show how you specifically meet the criteria
Criteria
Criterion Weight
Exterior: architectural character, curb appeal and integration of the home into its setting 20.0%
Interior: creative and innovative use of space, architectural and finishing detail 20.0%
Functionality of floor plan 20.0%
Environmental/energy efficiency inclusions 20.0%
Construction details/techniques to achieve best practices 20.0%